Industrial Engineering, Mechanical Engineering, Structural Engineering
Installation of a 250,000 lbs/h deaerator
Installation of a new 250,000 lbs/h deaerator at the Cabano plant:
- Engineering of the new steam production process
Piping engineering and stress calculations
Electrical distribution and instrumentation/control engineering.
Engineering of a new 30-foot-high mezzanine to accommodate the new equipment.
Project cost: $3 million