Installation of a 250,000 lbs/h deaerator

Client
Cascades - Cabano
Année
2022
Services rendus

Installation of a new 250,000 lbs/h deaerator at the Cabano plant:

  • Engineering of the new steam production process
    Piping engineering and stress calculations
    Electrical distribution and instrumentation/control engineering.
    Engineering of a new 30-foot-high mezzanine to accommodate the new equipment.
    Project cost: $3 million